What roofers should know before moving a rooftop AC unit.

The roofing schedule gets easier when the rooftop AC plan is settled before the crew starts. A job walk gives the roofer, property contact, and HVAC team one clear sequence for temporary removal and reinstallation.

Updated October 1, 2026

Coordinate early

Do not leave the rooftop AC decision for the morning the roofing crew arrives.

Working around a rooftop unit can slow production and make it harder to complete the roof surface correctly. The HVAC scope should be reviewed while the roofing schedule is still being planned.

Certified Air Services requires an on-site job walk before final pricing. Photos can help identify the project, but they do not replace reviewing the equipment, roof access, working clearance, and sequence in person.

  • Residential and commercial roofing projects
  • One site-specific job walk
  • Clear roofer and property-contact coordination
  • No photo-only final pricing

What the job walk confirms

Everyone looks at the same unit before anything is disconnected.

The job walk is where the roofer, property contact, and HVAC team agree on what has to be disconnected, where the unit will sit while the roof is open, and what has to be true before it goes back down. Settling those details on the roof is faster than sorting them out by phone once the crew is working.

  • Electrical disconnect and wiring condition
  • Gas connection on gas/electric package units
  • Condensate drain routing
  • Curb condition and duct connections
  • A clear set-aside spot on the same roof
  • Roof access for the HVAC crew

The working sequence

Disconnect, set aside, complete the roof, and reinstall.

After the job walk and approved scope, the AC unit is temporarily disconnected and set aside on the same roof. The roofing crew completes the affected area, then Certified Air Services returns to reinstall the unit.

This service is temporary removal and reinstallation for the roofing project. It is not advertised as permanent equipment disposal or a full AC replacement.

  • Schedule the HVAC work around the roofing plan
  • Temporarily disconnect the rooftop AC unit
  • Set the unit aside on the same roof
  • Reinstall after the affected roof area is complete

Plan for the new roof

Check the curb before the new roof goes on.

If the new roof adds insulation or otherwise raises the roof surface, the existing curb may end up too short for proper flashing. That is a roofing detail with an HVAC consequence, so it should be raised during the job walk, not discovered when the unit is about to be set back down.

The same goes for a damaged or poorly sealed curb. While the unit is set aside, the curb is fully exposed, which makes it the easiest time to address. Who handles any curb work should be agreed on before the project starts.

What usually stays simple

The unit normally stays on the roof, so a crane is not usually needed.

Most projects do not require the unit to be lowered to the ground. Keeping it on the roof avoids adding unnecessary lifting work, while the required job walk confirms whether the actual roof and access conditions fit the normal process.

  • Unit typically remains on the roof
  • Crane not normally required
  • Actual access confirmed during the job walk
  • Final scope documented before scheduling

Finishing the job

Reinstallation ends with the unit reconnected and running.

Once the roofing crew completes the affected area, Certified Air Services returns to set the unit back on the curb, reconnect it, and check that it is operating normally, so the property contact knows cooling has been restored.

  • Unit set back on the curb
  • Electrical and, where applicable, gas reconnected
  • Condensate drain reconnected
  • Normal operation checked

Help the schedule move

Bring the project contact, address, unit count, access details, and target dates to the first call.

That information helps the team understand the project and schedule the required job walk. Final pricing follows the site review so the proposal matches the real roof and equipment conditions.

COMMON QUESTIONS

Common questions from roofers

Can Certified Air Services work directly with the roofer?

The job walk and schedule can include the roofer and property contact so the temporary disconnect, roofing work, and reinstallation sequence is clear before the project starts.

How far ahead should we schedule?

As early as the roofing schedule allows. The job walk has to happen before final pricing and scheduling, so building it into the roofing plan early keeps the HVAC work from holding up the crew.

What if the rooftop unit is old or already having problems?

Bring it up during the job walk. This service is temporary removal and reinstallation for the roofing project. If replacing the unit makes more sense, that is a separate scope and should be discussed before the roof work is scheduled.

Which Southern California areas are covered?

The current focus includes the Inland Empire and Orange County, using the cities already listed in the Certified Air Services service area. Confirm the project address when requesting the job walk.